    C3000 and C5000 Site Preparation Checklist

    The checklist in Table 1 summarizes the tasks you must perform when preparing a site for controller installation.

    Table 1: C Series Site Preparation Checklist

    Item or Task

    For More Information

    Performed By

    Date

    Verify that environmental factors such as temperature and humidity do not exceed controller tolerances.

    C3000 and C5000 Controller Environmental Specifications

      

    Select the type of rack.

    C3000 and C5000 Controller Rack Requirements

      

    Plan rack or cabinet location, including required space clearances.

      

    If a rack is used, secure it to the floor and building structure.

    C3000 and C5000 Controller Rack Requirements

      

    Acquire cables and connectors.

       

    Measure the distance between external power sources and the controller installation site.

       