C3000 and C5000 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform when preparing a site for controller installation.
Table 1: C Series Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Verify that environmental factors such as temperature and humidity do not exceed controller tolerances. | |||
Select the type of rack. | |||
Plan rack or cabinet location, including required space clearances. | |||
If a rack is used, secure it to the floor and building structure. | |||
Acquire cables and connectors. | |||
Measure the distance between external power sources and the controller installation site. |