[Contents] [Prev] [Next] [Index] [Report an Error]


Before You Power Up the System

Before powering up the system, you should complete the tasks shown in Table 6-1. Refer to the appropriate chapters in this guide for information about these tasks.



Warning: Be sure the power source is turned off and the system is turned off before you perform the installation tasks.

Table 6-1 Installation tasks  
Installation Task
Reference
Install an SRP module and SRP I/O module in slot 6 or 7 in the ERX-1400 series chassis or slot 0 or 1 in the ERX-700 series chassis.
Install the line modules and their corresponding I/O modules in the system.
Cover unused slots with blank faceplates.
Connect DC power (-48 VDC) to the power input lugs on the power input module.
Connect a management console to the system.
(Optional) Connect the 10/100Base-T port to the network.


[Contents] [Prev] [Next] [Index] [Report an Error]