Add a Maintenance Event
To add a maintenance event:
Field |
Description |
---|---|
Name |
Enter a name for the maintenance event. Note:
Ensure that there are no spaces in the maintenance event name. |
Start |
|
End |
Enter an end time for the maintenance event (similar to Start time). Note:
The minimum time interval between start and end time of a maintenance event should be 5 minutes. |
Owner |
Auto-populates with the name of the user who is scheduling the maintenance event. |
Description |
Enter a description for the maintenance event. |
Auto Complete at End Time |
Automatically completes the maintenance event and brings the elements back up at the specified end time. If the check box is not selected, you must manually complete the maintenance event after it finishes. When a maintenance event is completed, it brings the maintenance elements back to an Up state, ready for path reoptimization. The affected LSPs are then rerouted to optimal paths unless you have deselected Reoptimize Tunnels Upon Completion. |
Reoptimize Tunnels upon Completion |
Reoptimizes the LSPs that were affected by the maintenance event when the maintenance event is completed. When you toggle the Reoptimize Tunnels upon Completion option, that behavior is disabled. This allows you to use a maintenance event to temporarily disable a link. |
Nodes |
Select the nodes in the left column and click the right arrow to move them to the right (selected) column. Click the left arrow to deselect elements. You can also search for a specific node from Search here option. |
Links |
Select the links in the left column and click the right arrow to move them to the right (selected) column. Click the left arrow to deselect elements. You can also search for a specific link from Search here option. |
Facilities |
Select the facilities in the left column and click the right arrow to move them to the right (selected) column. Click the left arrow to deselect elements. You can also search for a specific facility from Search here option. |