MX2010 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.
Item or Task |
For More Information |
Performed By |
Date |
---|---|---|---|
Environment |
|||
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. |
|||
Power |
|||
Measure distance between external power sources and router installation site. |
MX2010 DC Power Supply Module (-48 V) Description MX2000 DC Power Supply Module (240 V China) Description MX2010 High-Voltage Universal (HVAC/HVDC) Power Supply Module Description |
||
Locate sites for connection of system grounding. |
|||
Calculate the power consumption and requirements. |
MX2010 High-Voltage Universal (HVAC/HVDC) Power Requirements |
||
Rack |
|||
Verify that your rack meets the minimum requirements for the installation of the router. |
|||
Plan rack or cabinet location, including required space clearances. Note:
If you are installing the MX2010 router into a network cabinet, make sure that no hardware, device, rack, or cabinet component obstructs the 34-U rack space from access during installation. |
MX2010 Cabinet Size and Clearance Requirements, MX2010 Rack Requirements, Clearance Requirements for Airflow and Hardware Maintenance for the MX2010 Router |
||
If a rack is used, secure rack to floor and building structure. |
|||
Cables and Transceivers |
|||
Acquire cables and transceivers:
|
Fiber-Optic Cable Signal Loss, Attenuation, and Dispersion Calculating Power Budget and Power Margin for Fiber-Optic Cables |
||
Plan the cable routing and management. |