Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Resynchronizing the Topology View

 

You can resynchronize the topology map displayed on the Connectivity Services Director GUI, which enables the latest links information, label-switched path (LSP) details, and device states to be retrieved from the CSD-Topology application and shown in the Topology View. This resynchronization capability enables you to view the most recent synchronization of paths signaled across routed network elements. It is essential to view the latest topology information in a network that has changing traffic conditions and transmission states to be able to modify the link and LSP settings according to the deployment needs. The resynchronization functionality enables you to obtain the up-to-date topology states.

To create a job to resynchronize the topology map:

  1. From the Junos Space user interface, click the Build icon on the Connectivity Services Director banner.

    The workspaces that are applicable to Build mode are displayed on the Tasks pane.

  2. From the View selector, select Topology View.

    The topology map of the sites or zones and the devices configured in each zone using the CSD-Topology is displayed.

  3. Click the Resynch the Topology icon (5 o’clock symbol) to create a job to resynchronize the topology map.

    A job is triggered and a pop-up dialog box displays the job ID.

  4. Click OK to close the pop-up dialog box.

    You can navigate to the Job Management page to view the status of the resynchronization job (which you can launch by clicking the System button on the Connectivity Services Director banner and selecting Manage Jobs from the Tasks pane).