Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Site Preparation Checklist for ACX7024 and ACX7024X Routers

The Site Preparation Checklist for ACX7024 and ACX7024X Routers summarizes the tasks you need to perform when preparing a site for an installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information

Performed by

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed router tolerances.

Environmental Requirements and Specifications for ACX7024 Routers

 

 

Power

Measure the distance between external power sources and router installation site.

 

 

 

Calculate the power consumption and requirements.

DC Power Specifications for ACX7024 and ACX7024X Routers

 

 

Rack or Cabinet

Verify that your rack or cabinet meets the minimum requirements for the installation of the router.

Rack Requirements for ACX7024 and ACX7024X Routers

 

 

Plan rack or cabinet location, including required space clearances.

Clearance Requirements for Hardware Maintenance of ACX7024 and ACX7024X Routers

 

 

Secure the rack or cabinet to the floor and building structure.

 

 

 

Cables

Acquire cables and connectors:

  • Determine the number of cables needed based on your planned configuration.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

Determining Transceiver Support for ACX7024 and ACX7024X

Cable and Connector Specifications for ACX7024 and ACX7024X

 

 

Plan the cable routing and management.