Links (Staged)
You can perform various tasks from the staged links view of the blueprint. You can perform additional links-related tasks, such as adding, editing and deleting links, from the staged topology view of the blueprint.
You can perform the following tasks from the staged links view:
- Import cabling map
- Export cabling map
- Override cabling using the Apstra GUI or JSON
- Change link speeds
- Fetch discovered LLDP data
- Edit link properties
- Add and remove tags on a single link or multiple links
From the blueprint, navigate to Staged > Physical > Links to
go to staged links.
Links Example
In this example, each link is assigned a unique /31 subnet from the IP Pool, the smaller
/31 IP is assigned to the spine interface, the larger /31 IP is assigned to the leaf
interface. Subnets are assigned in increasing order in a spine-major order, that is, the
links between spine1 and all leafs (in ascending order) are assigned subnets first,
followed by links between spine2 and all leafs, and so on.