Site Preparation Checklist for the SRX5400 Services Gateway
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for services gateway installation.
Item or Task |
For More Information ... |
Performed By |
Date |
---|---|---|---|
Verify that environmental factors such as temperature and humidity do not exceed services gateway tolerances. |
|||
Select the type of rack or cabinet. |
SRX5400 Services Gateway Cabinet Size and Clearance Requirements,SRX5400 Services Gateway Rack Size and Strength Requirements |
||
Plan rack or cabinet location, including required space clearances. |
Clearance Requirements for SRX5400 Services Gateway Airflow and Hardware Maintenance |
||
Plan electrical power provisions. |
Calculating Power Requirements for the SRX5400 Services Gateway |
||
If a rack is used, secure rack to floor and building structure. |
Connection to Building Structure for the SRX5400 Services Gateway Rack |
||
Acquire cables and connectors. |
|||
Locate sites for connection of system grounding. |
|||
Measure distance between external power sources and services gateway installation site. |
|||
Calculate the optical power budget and optical power margin. |
Calculating Power Budget for Fiber-Optic Cable for the SRX5400 Services Gateway,Calculating Power Margin for Fiber-Optic Cable for the SRX5400 Services Gateway |