[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]

Installation Overview

After you have prepared your installation site as described in Preparing the Site for Services Gateway Installation, you are ready to unpack and install the services gateway. It is important to proceed through the installation process in the following order:

  1. Review the safety guidelines explained in Safety and Regulatory Compliance Information.
  2. Follow the instructions in this chapter to unpack the services gateway and verify that the parts are received.
  3. Install the mounting hardware as described in Installing the Mounting Hardware.
  4. Install the services gateway as described in Installing the Services Gateway or Installing the Services Gateway Without a Mechanical Lift.
  5. Connect cables to external devices as described in Connecting the Services Gateway.
  6. Connect the grounding cable as described in Grounding the Services Gateway.
  7. Connect the power cables as described in Connecting Power to an AC-Powered Services Gateway or Connecting Power to a DC-Powered Services Gateway.
  8. Power on the services gateway as described in Powering On a DC-Powered Services Gateway or Powering On an AC-Powered Services Gateway.
  9. Perform the initial system startup as described in Configuring the JUNOS Software.

[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]