Equal Cost Multiple-Path Recommended Instructions
Following is a high-level, sequential outline of the Equal Cost Multiple-Paths features and the associated, recommended procedures.
Open the Equal Cost Multi-Paths Report as described in Step 3 and Step 4.
of the Identifying Equal Cost Multiple Paths topic.View the equivalent cost paths between two nodes as described in Step 5 to Step 9 of the Identifying Equal Cost Multiple Paths.
Create sub-flows between two nodes as described in Splitting a Flow into Sub-Flows.