SRX380 Site Preparation Checklist

Table 1 provides a checklist of the tasks you need to perform when preparing a site for installing the SRX380 Firewall.

Table 1: Site Preparation Checklist for SRX380 Firewall Installation

Item or Task

Additional Information

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

SRX380 Firewall Environmental Specifications

Power

Measure the distance between the external power sources and the device installation site.

SRX380 Firewall Electrical Wiring Guidelines

Locate sites to connect system grounding.

Connecting the SRX380 Grounding Cable

Calculate the power consumption and requirements.

Table 1

Rack Requirements

Verify that your rack meets the minimum requirements.

Rack Requirements

Rack Installation

Plan the rack location, including required space clearances.

Rack Requirements

Secure the rack to the floor and building structure.

Cabinet Requirements

Verify that your cabinet meets the minimum requirements.

Cabinet Requirements

Plan the cabinet location, including required space clearances.

Cables

  • Acquire cables and connectors.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

  • Plan the cable routing and management.