QFX5140 Site Preparation Checklist
The checklist summarizes the tasks you need to perform when preparing a site for a QFX5140 installation.
Item or Task |
For More Information |
Performed By |
Date |
|---|---|---|---|
| Environment | |||
|
Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. |
|
|
|
| Power | |||
|
Measure the distance between external power sources and the switch installation site. |
— |
|
|
|
Calculate the power consumption and requirements. |
|
|
|
| Rack or Cabinet | |||
|
Verify that your rack or cabinet meets the minimum requirements for installing the switch. |
|
|
|
|
Plan rack or cabinet location, including required space clearances. |
QFX5140 Clearance Requirements for Airflow and Hardware Maintenance |
|
|
|
Secure the rack or cabinet to the floor and building structure. |
- |
|
|
| Cables | |||
|
Acquire cables and connectors:
|
|
|
|
|
Plan the cable routing and management. |
— |
|
|