Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
ON THIS PAGE
 

Routine Maintenance Procedures for the MX2010 Router

Purpose

For optimum router performance, perform preventive maintenance procedures.

Note:

Some components, such as the craft interface, require no maintenance.

Action

  • Inspect the installation site for moisture, loose wires or cables, and excessive dust. Make sure that airflow is unobstructed around the router and into the air intake vents.

  • Check the status-reporting devices on the craft interface—system alarms and LEDs.

  • Inspect the two air filters located just below the upper and lower power supply modules (PSMs), replacing them every 6 months for optimum cooling system performance.

  • Inspect the air filter at the bottom rear of the router, replacing it every 6 months for optimum cooling system performance. Do not run the router for more than a few minutes without the air filter in place.

  • Inspect the air filter in the front of the middle cable manager of the router, replacing it every 6 months for optimum cooling system performance. Do not run the router for more than a few minutes without the air filter in place.