Verifying Post-Installation Connectivity
After installation, connect the access point to the appropriate network uplink and allow time for the AP to obtain an IP address, reach the applicable management service, and complete onboarding or provisioning. Use the System Status LED to confirm that the AP is receiving power and progressing through startup; then verify connectivity in the applicable management platform.