Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation
Guide That Contains This Content
[+] Expand All
[-] Collapse All

    Scheduling a Report Overview

    The Scheduled Reports screens lets you view all of the reports currently scheduled to run on the system, add a new report to the list, edit an existing report schedule, edit an existing report options, or enable/disable an existing report scheduled to run. You can configure the reporting interface to generate a report on a custom schedule which will be automatically e-mailed to any e-mail address specified.

    Figure 1: Scheduled Reports

    Scheduled Reports

    Published: 2015-02-04