Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation
Guide That Contains This Content
[+] Expand All
[-] Collapse All

    Equal Cost Multiple-Path Recommended Instructions

    Following is a high-level, sequential outline of the Equal Cost Multiple-Paths features and the associated, recommended procedures.

    • Open the Equal Cost Multi-Paths Report as described in step 3 and step 4.
    • View the equivalent cost paths between two nodes as described in step 5 to step 9.
    • Create sub-flows between two nodes as described in step 1 to step 4.

    Modified: 2016-11-08