Equal Cost Multiple-Path Recommended Instructions
Following is a high-level, sequential outline of the Equal Cost Multiple-Paths features and the associated, recommended procedures.
Open the Equal Cost Multi-Paths Report as described in step 3 and step 4.
View the equivalent cost paths between two nodes as described in step 5 to step 9.
Create sub-flows between two nodes as described in step 1 to step 4.