Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Scheduling Configuration Checking in Task Manager

Compliance Assessment and integrity checks can be automatically performed at a designated time interval, using the Configuration Check Report task of the Task Manager. Go to Admin > Task Manager. In the Task Manager, press the “New Task” button. Select the Configuration Check Report task, enter a name for the task, and then press “Next”.

Figure 1: Configuration Check Report TaskSoftware interface with tabs for Configuration Comparison, Conformance Check, Integrity Check Report, and Report Options. Conformance Check tab selected.
  1. On the Conformance Check tab, select the checkmark for Conformance check and browse for the conformance project file.

  2. On the Report Options tab, indicate where the task results should be saved and whether or not to e-mail the test results.

    Figure 2: Compliance Assessment Report OptionsModify Task interface for Config Comparison, Conformance and IC Report with tabs for report settings and options to save results, set file paths, and send notification emails.
  3. Click “Next” and then specify the scheduling parameters, such as the interval at which to run this task.

  4. Click “Finish” to submit the task.