Migration, Upgrade, and Downgrade Instructions
This section contains the upgrade and downgrade support policy for Junos OS for the JRR Series Route Reflector. Upgrading or downgrading Junos OS might take several minutes, depending on the size and configuration of the network.
For information about software installation and upgrade, see the JRR200 Route Reflector Quick Start and Installation and Upgrade Guide.
Upgrade and Downgrade Support Policy for Junos OS Releases and Extended End-Of-Life Releases
We have two types of releases, standard EOL and EEOL:
-
Standard End of Life (EOL) releases have engineering support for twenty four months after the first general availability date and customer support for an additional six more months.
-
Extended End of Life (EEOL) releases have engineering support for sixty months after the first general availability date and customer support for an additional six more months.
Note:The sixty months of support for EEOL releases is introduced in Junos OS 23.2 release and is available for all later releases. For releases prior to 23.2, the support for EEOL releases continues to be thirty six months.
For both standard EOL and EEOL releases, you can upgrade to the next three subsequent releases or downgrade to the previous three releases. For example, you can upgrade from 21.2 to the next three releases – 21.3, 21.4 and 22.1 or downgrade to the previous three releases – 21.1, 20.4 and 20.3.
For EEOL releases only, you have an additional option - you can upgrade directly from one EEOL release to the next two subsequent EEOL releases, even if the target release is beyond the next three releases. Likewise, you can downgrade directly from one EEOL release to the previous two EEOL releases, even if the target release is beyond the previous three releases. For example, 21.2 is an EEOL release. Hence, you can upgrade from 21.2 to the next two EEOL releases – 21.4 and 22.2 or downgrade to the previous two EEOL releases – 20.4 and 20.2.
Release Type | End of Engineering (EOE) | End of Support (EOS) | Upgrade/Downgrade to subsequent 3 releases | Upgrade/Downgrade to subsequent 2 EEOL releases |
---|---|---|---|---|
Standard End of Life (EOL) | 24 months | End of Engineering + 6 months | Yes | No |
Extended End of Life (EEOL) | 60 months | End of Engineering + 6 months | Yes | Yes |
For more information about standard EOL and EEOL releases, see https://www.juniper.net/support/eol/junos.html.
For information about software installation and upgrade, see the Installation and Upgrade Guide.