Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

request node power-on (Junos OS Evolved)

Syntax

Description

Use this command to power on a Routing Engine. The node reboots, which can take a few minutes.

Options

node-name

Specify the Routing Engine node to power on.

(at time | in minutes)

(Optional) Specify when the action should occur, either in time, in hh:mm format, or in number of minutes.

message message

(Optional) Message to display to all users.

Required Privilege Level

view

Sample Output

request node power-on re1

Release Information

Command introduced in Junos OS Evolved Release 18.3R1.