Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

request system power-cycle (Junos OS Evolved)

Syntax (SRX400, SRX440, SRX440-2AC)

Description

Powers off and restarts the device. Unlike a software reboot, a power cycle cuts power to all hardware components and reinitializes them on startup. Use this command to activate firmware upgrades that require a full power cycle, such as RE CPLD firmware.

Options

at

Schedules the power cycle at a specific time. Specify the time in hh:mm 24-hour format.

in

Delays the power cycle by the specified number of minutes before the operation begins.

message

Displays a message to all users logged in to the device before the power cycle begins.

Required Privilege Level

maintenance

Sample Output

request system power-cycle (SRX400, SRX440, SRX440-2AC)

Release Information

Command introduced in Junos OS Evolved Release 25.4X300D10EVO