Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Add Mesh Links (Collapsed)

You can increase the number of mesh links in your collapsed fabric topology as a Day 2 operation. You might do this, for example, when you want to increase network capacity, or because the incorrect number of links were allocated when the template was created. As of Apstra version 5.0.0, you can perform this task from the Apstra GUI.
  1. From the blueprint, navigate to Staged > Physical > Topology and select the leaf where you want to add a link.
  2. Select the leaf check box to see the operations available for that leaf (and that you have permissions for), then click Add mesh links.
  3. In the dialog that opens, select the ports and transformations on each leaf, then click Add Link. (It'll turn green when valid ports and transformations are selected.)
  4. Click Add to stage the addition and return to the Topology view.
When you're ready to activate your changes, commit them from the Uncommitted tab.