Add Mesh Links (Collapsed)
You can increase the number of mesh links in your collapsed fabric topology as a Day 2
operation. You might do this, for example, when you want to increase network capacity, or
because the incorrect number of links were allocated when the template was created. As of
Apstra version 5.0.0, you can perform this task from the Apstra GUI.
When you're ready to activate your changes, commit them from the
Uncommitted tab.