Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Add Access Switch

For more information about access switches, see Rack Types.
  1. From the blueprint, navigate to Staged > Physical > Topology and select the node to add an access switch to.
  2. Select the node check box to see the operations available for that node (and that you have permissions for).
    Note:

    You can also get to the selection page from the Nodes view. From the blueprint, navigate to Staged > Physical > Nodes, click the node name in the table, then click the node name that appears at the top of the Selection panel (on the right side of the page).

  3. Click Add access switch and enter a unique label and hostname.
  4. Select the appropriate interface map from the drop-down list.
  5. Enter the port channel ID min and max.
  6. Enter tags (optional) to identify the role(s) of the new access switch, then click Next.
  7. Select available ports and transformations, as applicable. The gray Add Link button turns green.
  8. Click Add Link. The link is added to the link table.
  9. Click Create to stage the change and return to the Topology view.

When you're ready to activate your changes, commit them from the Uncommitted tab.