Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Cabling Map Operations

You can perform the following tasks from the staged Links view:

Note:

You can perform additional links-related tasks, such as adding, editing and deleting links, from Staged > Physical > Topology.

From the blueprint, navigate to Staged > Physical > Links to go to links summary table.

Links Example

In this example, each link is assigned a unique /31 subnet from the IP Pool, the smaller /31 IP is assigned to the spine interface, the larger /31 IP is assigned to the leaf interface. Subnets are assigned in increasing order in a spine-major order, that is, the links between spine1 and all leafs (in ascending order) are assigned subnets first, followed by links between spine2 and all leafs, and so on.