Resolved Issues
The following issue is resolved in Address Pool Manager 3.6.0:
-
In a multiple geography deployment, if a node is lost in a workload cluster and the microservices that were running on that node cannot be scheduled on the remaining nodes in the workload cluster (for example there are insufficient resources to satisfy the resource requests of the evicted microservices), the microservices will be scheduled on the peer workload cluster. This creates a partial switchover scenario. APM requires that all microservices that exist on only one workload cluster at a time switch over together. APM in a partial switchover state will not function properly. PR1898012