Site Preparation Checklist for a QFX3500 Device
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for QFX3500 device installation.
Item or Task |
For More Information |
Performed By |
Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. |
Environmental Requirements and Specifications for a QFX3500 Device |
|
|
Power | |||
Measure distance between external power sources and device installation site. |
|
|
|
Calculate the power consumption and requirements. |
|
|
|
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the device. |
|
|
|
Plan rack or cabinet location, including required space clearances. |
Clearance Requirements for Airflow and Hardware Maintenance for a QFX3500 Device |
|
|
Secure the rack or cabinet to the floor and building structure. |
|
|
|
Cables | |||
Acquire cables and connectors:
|
Determining Interface Support for the QFX3500 Device Determining Transceiver Support for QFabric Systems Cable Specifications for Console and Management Connections for the QFX Series |
|
|
Plan the cable routing and management. |
|
|
|