Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Site Preparation Checklist for SSR1200

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for SSR1200 installation.

Table 1: Site Preparation Checklist for SSR1200 Installation

Item or Task

Additional Information

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

Environmental Requirements and Specifications for SSR1200

Power

Measure the distance between the external power sources and the device installation site.

Locate sites for connection of system grounding.

 

Calculate the power consumption and requirements.

Rack Requirements

Verify that your rack meets the minimum requirements.

Rack Requirements for SSR1200

Rack Installation

Plan the rack location, including required space clearances.

Clearance Requirements for Hardware Maintenance of SSR1200

Secure the rack to the floor and building structure.

Cables

  • Acquire cables and connectors.

  • Review the maximum distance allowed for each cable. Choose the length of the cable based on the distance between the hardware components being connected.

  • Plan the cable routing and management.