Site Preparation Checklist for SSR120

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for SSR120 installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information

Performed by

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed appliance tolerances.

Environmental Requirements and Specifications for SSR120

   
Power

Measure the distance between external power sources and the installation site.

     

Locate sites for connection of system grounding.

     

Calculate the power consumption and requirements.

     
Rack

Verify that your rack or cabinet meets the minimum requirements for the installation of the appliance.

Rack Requirements for SSR120

   

Plan rack location, including required space clearances.

     

Secure the rack or cabinet to the floor and building structure.

     
Desk

Verify that the desk meets the minimum requirements for the installation of the appliance.

Requirements for Mounting an SSR120 Appliance on a Desktop or Other Level Surface

   

Verify that there is appropriate clearance in your selected location.

Clearance Requirements for Hardware Maintenance of SSR120

   
Cables

Acquire cables and connectors:

  • Determine the number of cables needed based on your planned configuration.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

     

Plan the cable routing and management.