Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Site Preparation Checklist for SRX4300

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site to install the SRX4300.

Table 1: Site Preparation Checklist to install the SRX4300

Item or Task

Additional Information

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerance levels.

Environmental Requirements and Specifications for SRX4300

Power

Measure the distance between the external power sources and the device installation site.

Locate sites for connection of system grounding.

 

Calculate the power consumption and requirements.

Rack Requirements

Verify that your rack meets the minimum requirements.

Rack Requirements for SRX4300

Rack Installation

Plan the rack location, including required space clearances.

Secure the rack to the floor and building structure.

Cables

  • Acquire cables and connectors.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

  • Plan the cable routing and management.