Site Preparation Checklist for SRX4300
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site to install the SRX4300.
Item or Task |
Additional Information |
---|---|
Environment |
|
Verify that environmental factors such as temperature and humidity do not exceed device tolerance levels. |
|
Power |
|
Measure the distance between the external power sources and the device installation site. |
|
Locate sites for connection of system grounding. |
|
Calculate the power consumption and requirements. |
|
Rack Requirements |
|
Verify that your rack meets the minimum requirements. |
|
Rack Installation |
|
Plan the rack location, including required space clearances. |
|
Secure the rack to the floor and building structure. |
|
Cables |
|
|