Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Installing the MX2020 DC Cable Manager

Note:

To accommodate additional clearance, you may order an extended DC cable manager from Juniper Networks.

To install the DC cable manager (see Figure 1):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Position the DC cable manager over the two slots located on both sides of the DC PDM.
  3. Lift the DC cable manager slightly up while inserting the two flanges into the slots on both sides of the DC PDM.
  4. Push down to secure the DC cable manager in place.
Figure 1: Installing the Standard DC Cable ManagerInstalling the Standard DC Cable Manager

To install the DC cable manager for the DC PDM (240 V China) or the universal (HVAC/HVDC) PDM (see Installing the MX2020 DC Cable Manager):

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.

  2. Position the DC cable manager over the two slots located on both sides of the DC PDM.

  3. Lift the DC cable manager slightly up while inserting the two flanges into the slots on both sides of the DC PDM.

    Figure 2: Installing the DC Cable Manager on the DC PDM (240 V China) and Universal (HVAC/HVDC) PDMInstalling the DC Cable Manager on the DC PDM (240 V China) and Universal (HVAC/HVDC) PDM
  4. Push down to secure the DC cable manager in place. Tighten the screws using a screwdriver. See Figure 2.