Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
ON THIS PAGE
 

Maintaining the MX2010 Chassis FRU Power-On Sequence

Purpose

For optimum router performance, verify the condition of the FRU power-on sequence.

Action

On a regular basis:

  • Check the status of the MX2010 chassis FRU power on-sequence by issuing the show chassis power sequence command.

    The following output displays the chassis FRU power-on sequence:

    Note:

    Because the MPCs are combined with the adapter cards, the MPCs might not boot up in a specific power-on sequence.