Overview of Preparing the Site for the JATP400
To prepare a site for JATP400 appliance installation:
- Verify that environmental factors such as temperature and humidity do not exceed JATP400 tolerances.
- Verify that the site and installation plan meets all safety guidelines and requirements.
- Locate sites for connection of system grounding.
- Calculate the power consumption and requirements.
- Plan rack location, including required space clearances.
- Verify that the plan for power installation meets all electrical safety guidelines.
- Verify that your rack meets the minimum requirements for the installation of the JATP400 appliance.
- Plan to secure the rack to the floor and building structure.
- Plan the cable routing and management.