Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Agency Approvals for EX4100-H-12T

Agency Approvals

Safety

  • IEC 62368-1: 2023

  • IEC 62368-1:2014 (All country deviations): 2nd Edition: CB Scheme

  • IEC 62368-1:2018 (All country deviations): 3rd Edition: CB Scheme

  • EN 62368-1:2014+A11:2017, EN IEC 62368-1:2020+A11:2020

  • BS EN 62368-1:2014+A11:2017, BS EN IEC 62368-1:2020+A11:2020

  • UL 62368-1:2025

  • CSA C22.2 No. 62368-1:2025

  • UL 60950-1:2007

  • CAN/CSA C22.2 No. 60950-1-07+ A1:2011+A2:2014

EMC

  • IEEE 1613 and IEEE 1613.1

  • IEC 61850-3

  • IEC 61850-3 with IEC 61000-6-5

  • EN 50121-4

  • FCC 47 CFR Part 15 Class A

  • ICES-003 / ICES-GEN

  • BS EN 55032

  • BS EN 55035

  • BS EN 61000 Series

  • EN 300 386 V1.6.1

  • EN 300 386 V2.2.1

  • BS EN 300 386

  • EN 55032

  • CISPR 32

  • EN 55035

  • CISPR 35

  • IEC/EN 61000 Series

  • IEC/EN 61000-3-2

  • IEC/EN 61000-3-3

  • AS/NZS CISPR 32

  • VCCI-CISPR 32

  • BSMI CNS 15936

  • KS C 9835

  • KS C 9832

  • KS C 9610

  • NEBS GR-1089-CORE, Issue 8

    Note:

    For NEBS‑aligned installations, dual independent DC power feeds are required and the system must be installed in a compliant enclosure.

  • British Telecommunications (BT) GS7

  • Deutsche Telekom (DT) 1 TR 9