Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

Before You Install the CTP2000 Platform

Before installing the platform:

  • Refer to the platform specifications for the particular CTP model or series.

  • Have a plan for installing the device that takes into consideration future expansion.

  • Have the tools and accessories needed to complete the installation.

  • Read and understand the clearance requirements for the front and back of the chassis for cable routing and other unit access. SeeCTP2000 Environmental Requirements for more information.

  • Read and understand the clearance requirements for the top and bottom of the chassis to ensure adequate ventilation.

  • Prepare the equipment racks by measuring and marking space for each device and plenum you plan to install.