Step 2: Up and Running
Install the Switch in a Rack
The rack installation and power-on procedures vary slightly for each switch. For instructions specific to your switch, see the applicable hardware guide on the Juniper Mist Supported Hardware page.
Connect to the Network and Power On the Switch
Note:
Some tasks in the following procedure require you to configure or connect to services in your local network. We do not provide instructions for configuring or locating these services.
Congratulations! The switch should now appear as green/connected in the Mist portal. You've successfully onboarded your cloud-ready switch.