Running a Saved Operation

You can run saved operations in real time or at a scheduled interval. The execution of tasks in a concurrent compound operation is not guaranteed. The execution of tasks in a sequential compound operation is guaranteed in the order that you specify in the Add Compound Operation dialog box.

To run an operation that you have saved, follow these steps:

  1. From the Junos Scope main window, click Settings > Saved Operations. The Saved Operations dialog box appears.
    Image s001506.gif
  2. Click the Run link for the operation that you want to run. The Run Saved Operation dialog box appears.
    Image s001509.gif

    You can select to run the operation now or at a scheduled interval.

Running an Operation Now

To run an operation now or immediately, follow these steps:

  1. In the Saved Operations dialog box, select the Run operation link for the operation that you want to run. The Run Saved Operation dialog box appears.
  2. Click the Now option button and click OK to run the operation, immediately in real time. The View Status Records dialog box appears.
    Image s001489.gif

The View Status Records dialog box lets you view the status of each task that ran in a simple or compound operation. At a glance, you can see the operation name, operation type, the device name on which the operation ran, the user who ran the operation, operation status, start time, last updated time, and an operation status message.

The View Status Records dialog box refreshes every 10 seconds.

Note: If you run an operation using the Saved Operations wizard, you see one additional status record with an operation type of “ run operation” to indicate the status of running the saved operation. This status record will not appear if you run an operation using the Archive, Restore, or Inventory Scan wizards.

The status of a compound operation is successful when all tasks within it have run successfully.

Running a Scheduled Operation

To run a scheduled operation, do the following:

  1. In the Run Saved Dialog Box, click the Select Schedule option button.
  2. Select a schedule, and click OK.

    The Confirm Run Saved Operation dialog box appears.

    Image s001505.gif
  3. Confirm that the run settings for the operation are correct and click OK. The Saved Operations dialog box appears. The operation runs at the selected scheduled interval.