|
Verify that environmental factors such as temperature and humidity
do not exceed router tolerances.
| | | |
|
Measure the distances between external power sources and the
router installation site.
| | | |
|
Select the type of rack.
| | | |
|
Plan the rack location, including required space clearances.
| | | |
|
Secure the rack to the floor and the building structure.
| | | |
|
Acquire appropriate cables and connectors.
| | | |