[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]

T1 and E1 Loopback Signals

The control signal on a T1 or E1 link is the loopback signal. Using the loopback signal, the operators at the network control center can force the device at the remote end of a link to retransmit its received signals back onto the transmit path. The transmitting device can then verify that the received signals match the transmitted signals, to perform end-to-end checking on the link.

Two loopback signals are used to perform the end-to-end testing:

While the link is in loopback mode, the operator can insert test equipment onto the line to test its operation.


[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]