The control signal on a T1 or E1 link is the loopback signal. Using the loopback signal, the operators at the network control center can force the device at the remote end of a link to retransmit its received signals back onto the transmit path. The transmitting device can then verify that the received signals match the transmitted signals, to perform end-to-end checking on the link.
Two loopback signals are used to perform the end-to-end testing:
....100001000010000100...
....100100100100100100....
While the link is in loopback mode, the operator can insert test equipment onto the line to test its operation.