Symbols
A
- abnormal LED activity 1, 2
- access, management 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- accessing, fan tray
- adapters, I/O 1, 2
- agency certification 1, 2, 3, 4
- air filter 1
- airflow 1
- rack-mounted installation and
- specifications 1, 2
- alarm ports
- amperage 1, 2
- antistatic bags and containers
- assembly numbers, locating
- assigning an IP address
- auxiliary port 1, 2
B
- bays, upper and lower, right and left 1, 2, 3
- BNC connector
- booting
C
- cable management bracket
- cables
- cabling
- cabling router
- cabling SRP IOA
- Case Manager
- certification 1, 2, 3, 4
- chassis
- circulation, air
- classification, packet
- cleaning the router
- CLI (command-line interface)
- clock source input ports
- clocking problems
- command-line interface
- compliance
- components
- configuring cables 1, 2
- configuring management access
- configuring Telnet
- connecting console to the router
- connectors, pinouts
- console
- console port 1, 2
- consumption, power 1, 2
- conventions
- cooling system
- crossover cable
- current (electrical) requirements 1, 2
- customer support 1, 2
D
- damaged components, returning
- DB-9 connector 1, 2
- DC power 1, 2, 3
- detecting double-bit error
- diagnosing problems
- diagnostic LEDs
- dimensions of E120 router
- dimensions of E320 router
- dissipation, heat 1, 2
- distribution rack 1, 2
- documentation set
- double-bit errors
E
- E120 router
- assigning IP address to
- cabling
- cabling recommendations
- cleaning
- dimensions
- electrical requirements
- environmental requirements
- equipment rack requirements
- Ethernet cable
- installing
- installing modules
- lifting
- management access
- mechanical requirements
- modules
- power requirements
- powering down
- powering up
- safety guidelines
- site planning
- slot numbering
- space requirements 1, 2
- troubleshooting 1, 2
- unpacking
- views
- E320 router
- assigning IP address to
- cabling
- cabling recommendations
- cleaning
- dimensions
- electrical requirements
- environmental requirements
- equipment rack requirements
- Ethernet cable
- installing
- installing modules
- lifting
- management access
- mechanical requirements
- modules
- power requirements
- powering down
- powering up
- safety guidelines
- site planning
- slot numbering
- space requirements 1, 2
- troubleshooting 1, 2
- unpacking
- views
- EIA distribution rack
- ejectors, module
- electrical requirements 1, 2
- electronic equipment, recycling
- electrostatic discharge, precautions
- environmental requirements
- ESD grounding jack
- Ethernet link
- external timing ports
F
G
H
- halt command 1, 2
- hardware
- cable configuration 1, 2
- reclamation and recycling
- redundancy features
- repairing and replacing
- hazardous materials, reclamation and recycling
- heat dissipation 1, 2, 3
- high-availability mode
- hot-swapping fan trays
- hot-swapping modules
- humidity requirements 1, 2
- HyperTerminal
I
- I/O adapter 1, 2
- installing IOA shelf
- installing modules
- installing NVS cards 1
- installing router 1
- installing SFPs
- IOA module 1, 2
- IOA shelf 1
- IP address, assigning
J
L
M
- maintenance, system
- management
- management access 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- Management Information Bases
- management port
- managing modules
- manuals
- mechanical requirements for distribution rack
- MIBs (Management Information Bases)
- module reset button
- modules 1
- monitoring LEDs
- monitoring temperature
- mounting kits
- mounting posts for rack
N
- network management 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- network timing ports
- NMI button
- nonvolatile storage
- notice icons
- NVS cards 1
- installing 1, 2
- redundancy
- storing
O
P
- packaging, recycling
- packet classification
- packing instructions
- passwords, Telnet
- PC-CARD
- PCMCIA slot, SRP modules
- PDU 1
- pinouts, E Series router cables and connectors
- planning site for installation
- plenum
- ports
- power
- power distribution unit
- Power Distribution Unit (PDU)
- power input module, cabling
- power switches 1, 2
- powering down router
- powering up router
- preinstallation responsibilities
- preparing site for installation
- Privileged Exec command mode
- problems
- product numbers, locating
Q
R
- rack, distribution
- reclamation and recycling
- recycling Juniper Networks equipment
- redundancy 1
- regulatory requirements
- release mechanisms for SFPs
- removing components
- removing modules
- removing SFPs
- repacking components
- repairing hardware components
- replacing components
- replacing modules
- replacing NVS cards 1, 2, 3
- replacing SFPs 1, 2
- reset button
- resetting modules
- Restriction of Hazardous Substances (RoHS) Directive, recycling equipment
- Return Materials Authorization
- returning product
- RJ-45 connector 1, 2
- RMA (Return Materials Authorization)
- RoHS (Restriction of Hazardous Substances) Directive, recycling equipment
- RS-232 port 1, 2, 3, 4, 5
S
- safety
- agency certification 1, 2
- guidelines
- self-testing, modules
- serial numbers, locating
- SFM (switch fabric module) 1, 2
- SFPs (small form-factor pluggable transceivers) 1, 2
- show interface command
- show version command 1, 2, 3, 4, 5, 6, 7
- single-bit errors
- site planning
- size
- slices, fabric
- slot combinations 1, 2
- slot disable command
- slot groups 1
- slot numbering 1, 2
- small form-factor pluggable transceivers
- SNMP for management access 1, 2
- space requirements 1, 2, 3, 4
- specifications
- SRP (switch route processor) module 1, 2
- errors on
- installing
- IOA
- PCMCIA slot
- powering down
- redundancy
- removing 1, 2
- switch fabric slice 1, 2
- SRP IOA 1
- cabling 1, 2
- installing
- removing
- starting router
- static electricity, protecting against
- storing, modules and components
- support, technical See technical support
- switch fabric modules
- switch fabric slices 1, 2
- switch router processor modules
- switches, power 1, 2
- switchover, SRP modules
- synchronization, SRP modules
- system maintenance
T
- technical support 1
- Telnet connection to router
- temperature
- excessive 1, 2
- monitoring
- requirements 1, 2
- text and syntax conventions
- thermal protection mode 1, 2, 3
- timing port
- tools required
- cabling router
- installing modules
- removing components 1, 2
- unpacking router
- troubleshooting 1, 2
- booting
- cables 1, 2
- clocking
- double-bit errors
- Ethernet link
- fans 1, 2
- LED activity for
- modules 1, 2
- power failure 1, 2
- safety guidelines
U
V
W
- Waste Electrical and Electronic Equipment (WEEE) Directive. See WEEE Directive
- WEEE (Waste Electrical and Electronic Equipment) Directive, recycling equipment
- weight
- of E120 router
- of E320 router
- of rack 1, 2
Download This Guide
Upgrading NVS Cards on SRP Modules
This section describes how to install higher-capacity NVS cards on switch route processor (SRP) modules. The procedure you use depends on the number of SRP modules in the system. A new NVS card already contains the software release you ordered.
![]() | Note: The new NVS card must contain the same software release that you are running on the system. |
Upgrading a System That Contains One SRP Module
If the system contains only one SRP module, you must power down the system before you upgrade the NVS card.
![]() | Caution: If you do not use the halt command before removing or powering down an SRP module, the system's NVS card can become corrupted. |
To upgrade the NVS card on a system that contains one SRP module:
- Enter the halt command.
See JunosE System Basics Configuration Guide, Chapter 6, Managing Modules for information about the halt command.
Warning: Do not insert any metal object, such as a screwdriver, or place your hand into an open slot or the backplane when the router is on. Remove jewelry (including rings, necklaces, and watches) before working on equipment that is connected to power lines. These actions prevent electric shock and serious burns.
Caution: When handling modules, use an antistatic wrist strap connected to an ESD grounding jack. This action helps to protect the module from damage by electrostatic discharge.
- Connect the antistatic wrist strap to an ESD grounding jack on the router.
- Power down the system.
- Remove the SRP module.
- Replace the NVS card on the SRP module. (See Replacing an NVS Card.)
- Reinsert the SRP module into the chassis.
- Power up the system. (See Powering Up the Router.)
Upgrading a System That Contains Two SRP Modules
In a system that contains two SRP modules, you can upgrade the NVS cards on the SRP modules without powering down the system.
![]() | Warning: Do not insert any metal object, such as a screwdriver, or place your hand into an open slot or the backplane when the router is on. Remove jewelry (including rings, necklaces, and watches) before working on equipment that is connected to power lines. These actions prevent electric shock and serious burns. |
![]() | Caution: When handling modules, use an antistatic wrist strap connected to an ESD grounding jack. This action helps to protect the module from damage by electrostatic discharge. |
To upgrade the NVS cards on the SRP modules in a system that contains two SRP modules:
- Wear an antistatic wrist strap and connect it to one an ESD grounding jack on the router.
- Halt the redundant SRP module.host1#halt standby-srp
- Remove the redundant SRP module from the chassis.
- Replace the NVS card on this SRP module. (See Replacing an NVS Card.)
- Reinsert the SRP module into the chassis.
- When this SRP module is available, synchronize the SRP
modules.host1#synchronize
- When the SRP modules are synchronized, reboot the SRP
module that you upgraded.host1#reload standby-srp
- When this SRP module is available, synchronize the SRP
modules.host1#synchronize
- When the SRP modules are synchronized, force the redundant
SRP module to take over from the primary SRP module.host1#srp switch
- Halt the redundant (former primary) SRP module. host1#halt standby-srp
- Immediately remove the former primary SRP module.
- Repeat Steps 4–8 for the former primary SRP module.