Symbols
A
- abnormal LED activity 1, 2
- access, management 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- accessing, fan tray
- adapters, I/O 1, 2
- agency certification 1, 2, 3, 4
- air filter 1
- airflow 1
- rack-mounted installation and
- specifications 1, 2
- alarm ports
- amperage 1, 2
- antistatic bags and containers
- assembly numbers, locating
- assigning an IP address
- auxiliary port 1, 2
B
- bays, upper and lower, right and left 1, 2, 3
- BNC connector
- booting
C
- cable management bracket
- cables
- cabling
- cabling router
- cabling SRP IOA
- Case Manager
- certification 1, 2, 3, 4
- chassis
- circulation, air
- classification, packet
- cleaning the router
- CLI (command-line interface)
- clock source input ports
- clocking problems
- command-line interface
- compliance
- components
- configuring cables 1, 2
- configuring management access
- configuring Telnet
- connecting console to the router
- connectors, pinouts
- console
- console port 1, 2
- consumption, power 1, 2
- conventions
- cooling system
- crossover cable
- current (electrical) requirements 1, 2
- customer support 1, 2
D
- damaged components, returning
- DB-9 connector 1, 2
- DC power 1, 2, 3
- detecting double-bit error
- diagnosing problems
- diagnostic LEDs
- dimensions of E120 router
- dimensions of E320 router
- dissipation, heat 1, 2
- distribution rack 1, 2
- documentation set
- double-bit errors
E
- E120 router
- assigning IP address to
- cabling
- cabling recommendations
- cleaning
- dimensions
- electrical requirements
- environmental requirements
- equipment rack requirements
- Ethernet cable
- installing
- installing modules
- lifting
- management access
- mechanical requirements
- modules
- power requirements
- powering down
- powering up
- safety guidelines
- site planning
- slot numbering
- space requirements 1, 2
- troubleshooting 1, 2
- unpacking
- views
- E320 router
- assigning IP address to
- cabling
- cabling recommendations
- cleaning
- dimensions
- electrical requirements
- environmental requirements
- equipment rack requirements
- Ethernet cable
- installing
- installing modules
- lifting
- management access
- mechanical requirements
- modules
- power requirements
- powering down
- powering up
- safety guidelines
- site planning
- slot numbering
- space requirements 1, 2
- troubleshooting 1, 2
- unpacking
- views
- EIA distribution rack
- ejectors, module
- electrical requirements 1, 2
- electronic equipment, recycling
- electrostatic discharge, precautions
- environmental requirements
- ESD grounding jack
- Ethernet link
- external timing ports
F
G
H
- halt command 1, 2
- hardware
- cable configuration 1, 2
- reclamation and recycling
- redundancy features
- repairing and replacing
- hazardous materials, reclamation and recycling
- heat dissipation 1, 2, 3
- high-availability mode
- hot-swapping fan trays
- hot-swapping modules
- humidity requirements 1, 2
- HyperTerminal
I
- I/O adapter 1, 2
- installing IOA shelf
- installing modules
- installing NVS cards 1
- installing router 1
- installing SFPs
- IOA module 1, 2
- IOA shelf 1
- IP address, assigning
J
L
M
- maintenance, system
- management
- management access 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- Management Information Bases
- management port
- managing modules
- manuals
- mechanical requirements for distribution rack
- MIBs (Management Information Bases)
- module reset button
- modules 1
- monitoring LEDs
- monitoring temperature
- mounting kits
- mounting posts for rack
N
- network management 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- network timing ports
- NMI button
- nonvolatile storage
- notice icons
- NVS cards 1
- installing 1, 2
- redundancy
- storing
O
P
- packaging, recycling
- packet classification
- packing instructions
- passwords, Telnet
- PC-CARD
- PCMCIA slot, SRP modules
- PDU 1
- pinouts, E Series router cables and connectors
- planning site for installation
- plenum
- ports
- power
- power distribution unit
- Power Distribution Unit (PDU)
- power input module, cabling
- power switches 1, 2
- powering down router
- powering up router
- preinstallation responsibilities
- preparing site for installation
- Privileged Exec command mode
- problems
- product numbers, locating
Q
R
- rack, distribution
- reclamation and recycling
- recycling Juniper Networks equipment
- redundancy 1
- regulatory requirements
- release mechanisms for SFPs
- removing components
- removing modules
- removing SFPs
- repacking components
- repairing hardware components
- replacing components
- replacing modules
- replacing NVS cards 1, 2, 3
- replacing SFPs 1, 2
- reset button
- resetting modules
- Restriction of Hazardous Substances (RoHS) Directive, recycling equipment
- Return Materials Authorization
- returning product
- RJ-45 connector 1, 2
- RMA (Return Materials Authorization)
- RoHS (Restriction of Hazardous Substances) Directive, recycling equipment
- RS-232 port 1, 2, 3, 4, 5
S
- safety
- agency certification 1, 2
- guidelines
- self-testing, modules
- serial numbers, locating
- SFM (switch fabric module) 1, 2
- SFPs (small form-factor pluggable transceivers) 1, 2
- show interface command
- show version command 1, 2, 3, 4, 5, 6, 7
- single-bit errors
- site planning
- size
- slices, fabric
- slot combinations 1, 2
- slot disable command
- slot groups 1
- slot numbering 1, 2
- small form-factor pluggable transceivers
- SNMP for management access 1, 2
- space requirements 1, 2, 3, 4
- specifications
- SRP (switch route processor) module 1, 2
- errors on
- installing
- IOA
- PCMCIA slot
- powering down
- redundancy
- removing 1, 2
- switch fabric slice 1, 2
- SRP IOA 1
- cabling 1, 2
- installing
- removing
- starting router
- static electricity, protecting against
- storing, modules and components
- support, technical See technical support
- switch fabric modules
- switch fabric slices 1, 2
- switch router processor modules
- switches, power 1, 2
- switchover, SRP modules
- synchronization, SRP modules
- system maintenance
T
- technical support 1
- Telnet connection to router
- temperature
- excessive 1, 2
- monitoring
- requirements 1, 2
- text and syntax conventions
- thermal protection mode 1, 2, 3
- timing port
- tools required
- cabling router
- installing modules
- removing components 1, 2
- unpacking router
- troubleshooting 1, 2
- booting
- cables 1, 2
- clocking
- double-bit errors
- Ethernet link
- fans 1, 2
- LED activity for
- modules 1, 2
- power failure 1, 2
- safety guidelines
U
V
W
- Waste Electrical and Electronic Equipment (WEEE) Directive. See WEEE Directive
- WEEE (Waste Electrical and Electronic Equipment) Directive, recycling equipment
- weight
- of E120 router
- of E320 router
- of rack 1, 2
Download This Guide
Powering Up
![]() | Note: In this procedure we assume that the system is already connected to a power source. See Cabling the Router. |
![]() | Note: Juniper Networks has qualified an AC power supply unit for use with the router. Contact your account representative for more information. |
For specifications on the electrical requirements for the system, see System Specifications. For details on the power consumed by the different modules, see the E120 and E320 Module Guide.
![]() | Caution: Evaluate the overall loading of the branch circuit before you install any equipment into a rack. |
To power up the system:
- Verify that the power source is operational and turned on.
- Inspect all grounding and power connections to the router chassis.
- Confirm that all connections are secure.
- Switch the power switches to ON.
- Monitor the LEDs on the SRP modules and SFM modules to
verify that the system is booting properly. See Table 11 for LED status explanations.
When the prompt appears on the system console, the system is in User Exec mode and is ready to be configured:
host1> - Enter the enable command to
access Privileged Exec mode:host1>enablehost1#
In Privileged Exec mode you can begin to configure the system. See JunosE System Basics Configuration Guide, Chapter 2, Command-Line Interface for more information.
Initialization Sequence
Each line module is initialized independently. As a result, the CLI on the SRP module can become available before the line modules have completed initialization. Commands relating to a line module might fail if the module has not completed initialization. You can use the show version command to display line module status, but do not enter commands for a line module until its state is online.