Symbols
A
- abnormal LED activity 1, 2
- access, management 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- accessing, fan tray
- adapters, I/O 1, 2
- agency certification 1, 2, 3, 4
- air filter 1
- airflow 1
- rack-mounted installation and
- specifications 1, 2
- alarm ports
- amperage 1, 2
- antistatic bags and containers
- assembly numbers, locating
- assigning an IP address
- auxiliary port 1, 2
B
- bays, upper and lower, right and left 1, 2, 3
- BNC connector
- booting
C
- cable management bracket
- cables
- cabling
- cabling router
- cabling SRP IOA
- Case Manager
- certification 1, 2, 3, 4
- chassis
- circulation, air
- classification, packet
- cleaning the router
- CLI (command-line interface)
- clock source input ports
- clocking problems
- command-line interface
- compliance
- components
- configuring cables 1, 2
- configuring management access
- configuring Telnet
- connecting console to the router
- connectors, pinouts
- console
- console port 1, 2
- consumption, power 1, 2
- conventions
- cooling system
- crossover cable
- current (electrical) requirements 1, 2
- customer support 1, 2
D
- damaged components, returning
- DB-9 connector 1, 2
- DC power 1, 2, 3
- detecting double-bit error
- diagnosing problems
- diagnostic LEDs
- dimensions of E120 router
- dimensions of E320 router
- dissipation, heat 1, 2
- distribution rack 1, 2
- documentation set
- double-bit errors
E
- E120 router
- assigning IP address to
- cabling
- cabling recommendations
- cleaning
- dimensions
- electrical requirements
- environmental requirements
- equipment rack requirements
- Ethernet cable
- installing
- installing modules
- lifting
- management access
- mechanical requirements
- modules
- power requirements
- powering down
- powering up
- safety guidelines
- site planning
- slot numbering
- space requirements 1, 2
- troubleshooting 1, 2
- unpacking
- views
- E320 router
- assigning IP address to
- cabling
- cabling recommendations
- cleaning
- dimensions
- electrical requirements
- environmental requirements
- equipment rack requirements
- Ethernet cable
- installing
- installing modules
- lifting
- management access
- mechanical requirements
- modules
- power requirements
- powering down
- powering up
- safety guidelines
- site planning
- slot numbering
- space requirements 1, 2
- troubleshooting 1, 2
- unpacking
- views
- EIA distribution rack
- ejectors, module
- electrical requirements 1, 2
- electronic equipment, recycling
- electrostatic discharge, precautions
- environmental requirements
- ESD grounding jack
- Ethernet link
- external timing ports
F
G
H
- halt command 1, 2
- hardware
- cable configuration 1, 2
- reclamation and recycling
- redundancy features
- repairing and replacing
- hazardous materials, reclamation and recycling
- heat dissipation 1, 2, 3
- high-availability mode
- hot-swapping fan trays
- hot-swapping modules
- humidity requirements 1, 2
- HyperTerminal
I
- I/O adapter 1, 2
- installing IOA shelf
- installing modules
- installing NVS cards 1
- installing router 1
- installing SFPs
- IOA module 1, 2
- IOA shelf 1
- IP address, assigning
J
L
M
- maintenance, system
- management
- management access 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- Management Information Bases
- management port
- managing modules
- manuals
- mechanical requirements for distribution rack
- MIBs (Management Information Bases)
- module reset button
- modules 1
- monitoring LEDs
- monitoring temperature
- mounting kits
- mounting posts for rack
N
- network management 1, 2
- setting up console 1, 2
- SNMP 1, 2
- Telnet setup
- network timing ports
- NMI button
- nonvolatile storage
- notice icons
- NVS cards 1
- installing 1, 2
- redundancy
- storing
O
P
- packaging, recycling
- packet classification
- packing instructions
- passwords, Telnet
- PC-CARD
- PCMCIA slot, SRP modules
- PDU 1
- pinouts, E Series router cables and connectors
- planning site for installation
- plenum
- ports
- power
- power distribution unit
- Power Distribution Unit (PDU)
- power input module, cabling
- power switches 1, 2
- powering down router
- powering up router
- preinstallation responsibilities
- preparing site for installation
- Privileged Exec command mode
- problems
- product numbers, locating
Q
R
- rack, distribution
- reclamation and recycling
- recycling Juniper Networks equipment
- redundancy 1
- regulatory requirements
- release mechanisms for SFPs
- removing components
- removing modules
- removing SFPs
- repacking components
- repairing hardware components
- replacing components
- replacing modules
- replacing NVS cards 1, 2, 3
- replacing SFPs 1, 2
- reset button
- resetting modules
- Restriction of Hazardous Substances (RoHS) Directive, recycling equipment
- Return Materials Authorization
- returning product
- RJ-45 connector 1, 2
- RMA (Return Materials Authorization)
- RoHS (Restriction of Hazardous Substances) Directive, recycling equipment
- RS-232 port 1, 2, 3, 4, 5
S
- safety
- agency certification 1, 2
- guidelines
- self-testing, modules
- serial numbers, locating
- SFM (switch fabric module) 1, 2
- SFPs (small form-factor pluggable transceivers) 1, 2
- show interface command
- show version command 1, 2, 3, 4, 5, 6, 7
- single-bit errors
- site planning
- size
- slices, fabric
- slot combinations 1, 2
- slot disable command
- slot groups 1
- slot numbering 1, 2
- small form-factor pluggable transceivers
- SNMP for management access 1, 2
- space requirements 1, 2, 3, 4
- specifications
- SRP (switch route processor) module 1, 2
- errors on
- installing
- IOA
- PCMCIA slot
- powering down
- redundancy
- removing 1, 2
- switch fabric slice 1, 2
- SRP IOA 1
- cabling 1, 2
- installing
- removing
- starting router
- static electricity, protecting against
- storing, modules and components
- support, technical See technical support
- switch fabric modules
- switch fabric slices 1, 2
- switch router processor modules
- switches, power 1, 2
- switchover, SRP modules
- synchronization, SRP modules
- system maintenance
T
- technical support 1
- Telnet connection to router
- temperature
- excessive 1, 2
- monitoring
- requirements 1, 2
- text and syntax conventions
- thermal protection mode 1, 2, 3
- timing port
- tools required
- cabling router
- installing modules
- removing components 1, 2
- unpacking router
- troubleshooting 1, 2
- booting
- cables 1, 2
- clocking
- double-bit errors
- Ethernet link
- fans 1, 2
- LED activity for
- modules 1, 2
- power failure 1, 2
- safety guidelines
U
V
W
- Waste Electrical and Electronic Equipment (WEEE) Directive. See WEEE Directive
- WEEE (Waste Electrical and Electronic Equipment) Directive, recycling equipment
- weight
- of E120 router
- of E320 router
- of rack 1, 2
Download This Guide
Router Power Requirements
Table 16 lists the maximum power values for various modules and IOAs in an E120 router or E320 router and also provides the measured values when the router is operating with varying IMIX (Internet mix) values under typical conditions.
Table 16: Power Requirements for E120 Router and E320 Router
Component | Watts maximum | Watts measured @48V, nominal temperature | Model number | ||
---|---|---|---|---|---|
100%IMIX | 50%IMIX | 0%IMIX | |||
E320 Fan Tray | 495 | 234 | 234 | 234 | ES2-FANTRAY-FRU |
E120 Fan Tray | 108 | 72 | 72 | 72 | ES2-120FTRAY-FRU |
SRP IOA | 15 | 5 | 5 | 5 | ES2-SRP-IOA |
SRP-100 | 75 | 60 | 58 | 55 | ES2-100G-SRP |
SFM-100 | 40 | 30 | 26 | 25 | ES2-100G-SFM |
SRP-120 | 140 | 73 | 73 | 72 | ES2-120G-SRP |
SFM-120 | 95 | 47 | 45 | 45 | ES2-120G-SFM |
SRP-320 | 140 | 86 | 85 | 80 | ES2-320G-SRP |
SFM-320 | 95 | 48 | 45 | 45 | ES2-320G-SFM |
ES2 4G LM | 176 | 149 | 138 | 129 | ES2-4GS1-MOD |
ES2 10G UPLINK LM | 150 | 143 | 127 | 111 | ES2-10GUPS2-MOD |
ES2 10G LM | 198 | 166 | 148 | 134 | ES2-10GACS3-MOD |
ES2 10G ADV LM | 190 | 159 | 145 | 131 | ES2-10GACS4-MOD |
ES2-S1 GE-4 IOA | 21 | 16 | 16 | 15 | ES2-GE4S1-IOA |
ES2-S1 GE-8 IOA | 32 | 29 | 28 | 25 | ES2-GE8S1-IOA |
ES2-S3 GE-20 IOA | 92 | 80 | 79 | 62 | ES2-GE20S3-IOA |
ES2-S1 10GE IOA (ES2 10G LM) | 48 | 42 | 42 | 38 | ES2-10GES2-IOA |
ES2-S1 10GE IOA (ES2 4G LM) | 40 | 22 | 22 | 19 | ES2-10GES1-IOA |
ES2-S1 OC3-8 ATM IOA | 50 | 38 | 36 | 34 | ES2-8OC3AS1-IOA |
ES2-S1 OC12-2 ATM IOA | 40 | 29 | 28 | 27 | ES2-2OC12AS1-IOA |
ES2-S1 OC12-2 POS IOA | 30 | 18 | 18 | 18 | ES2-2OC12PS1-IOA |
ES2-S1-OC48 POS IOA | 30 | 16 | 16 | 16 | ES2-OC48PS1-IOA |
ES2-S1 REDUND IOA | 10 | 7 | 6 | 5 | ES2-REDUNDS1-IOA |
ES2-S1 SERVICE IOA | 10 | 4 | 4 | 4 | ES2-SERVS1-IOA |