Before You Power Up the System

Before powering up the system, you should complete the tasks shown in Table 7-1. Refer to the appropriate chapters in this guide for information about these tasks.



Warning: Be sure the power source is turned off and the system is turned off before you perform the installation tasks.

Table 7-1 Installation tasks  
Installation Task
Page
Install an SRP module and SRP I/O module
Install line modules and their corresponding I/O modules.
Cable all SRP I/O modules.
Connect a management console to the system.
(Optional) Connect the 10/100Base-T port to the network.


Warning: Be sure the power source is turned off and the system is turned off before performing the following task.

Connect DC power or AC power to your E-series router. (depending on model)
Cable all line modules.