Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation
Guide That Contains This Content
[+] Expand All
[-] Collapse All

    Installation Overview for the Junos Pulse Gateway

    After you have prepared your installation site, you are ready to unpack and install the services gateway. It is important to proceed through the installation process as shown in Table 1.

    Table 1: Installation Process Order for the Junos Pulse Gateway

    Step

    Task

    For more information, see

    1

    Review the safety guidelines explained.

    2

    Verify that you have prepared your site for the installation of the Junos Pulse Gateway using the checklist.

    General Site Guidelines for Installing the Junos Pulse Gateway

    3

    Unpack the Junos Pulse Gateway and verify that the parts are received.

    4

    Prepare the Junos Pulse Gateway for installation.

    Site Preparation Checklist for the Junos Pulse Gateway

    5

    Install the Junos Pulse Gateway.

    Installing the Junos Pulse Gateway in a Rack

    6

    Connect cables to external devices.

    Connecting the Junos Pulse Gateway to a Management Console

    7

    Connect the grounding cables.

    Grounding the Junos Pulse Gateway

    8

    Power on the Junos Pulse Gateway.

    Powering On an AC-Powered Junos Pulse Gateway

    9

    Perform Initial Configuration.

    Published: 2011-07-25