    Site Preparation Checklist for the Junos Pulse Gateway

    The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for installing the Junos Pulse Gateway.

    Table 1: Site Preparation Checklist for the Junos Pulse Gateway Installation

    Item or Task

    Additional Information

    Date and Notes

    Environment

    Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

    Junos Pulse Gateway Environmental Specifications

    Power

    • Measure distance between external power sources and device installation site.
    • Locate sites for connection of system grounding.

    Junos Pulse Gateway Electrical and Power Requirements

    Rack and Cabinet Installation

    • Verify that your rack meets the minimum requirements.
    • Plan rack location, including required space clearances.
    • Secure the rack to the floor and building structure.

    Junos Pulse Gateway Rack RequirementsJunos Pulse Gateway Cabinet Requirements

    Desktop Installation

    • Verify that the area selected meets the minimum requirements
    • Plan the installation location, including required space clearances and airflow requirements.

    Cables

    • Acquire cables and connectors.
    • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.
    • Plan the cable routing and management.

    Console Port Cable and Wire Specifications for the Junos Pulse Gateway

    Published: 2011-07-25