TCX1000-RDM20 Site Preparation Checklist

 

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for a TCX1000-RDM20 installation.

Table 1: Site Preparation Checklist

Task

For More Information

Performed by

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed the TCX1000-RDM20 tolerances.

TCX1000-RDM20 Environmental Requirements and Specifications

 

 

Power

Measure the distance between external power sources and the TCX1000-RDM20 installation site.

 

 

 

Calculate the power consumption and requirements.

TCX1000-RDM20 AC Power Specifications

TCX1000-RDM20 DC Power Specifications

 

 

Rack or Cabinet

Verify that your rack or cabinet meets the minimum requirements for the installation of the TCX1000-RDM20.

TCX1000-RDM20 Rack Requirements

TCX1000-RDM20 Cabinet Requirements

 

 

Plan rack or cabinet location, including required space clearances.

TCX1000-RDM20 Clearance Requirements for Airflow and Hardware Maintenance

 

 

Secure the rack or cabinet to the floor and building structure.

 

 

 

Cables

Acquire cables and connectors:

  • Determine the number of cables needed based on your planned configuration.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

 

 

 

Plan the cable routing and management.