Installing the TCA6000 or TCA6500 Timing Client

Caution:

  • Ground cable—Make a ground cable using 8-gauge wire with the supplied ground lug. This should attach to your building’s earth ground infrastructure.
  • Power— Route power connection using 18-22 gauge wire to a 48-volt power distribution frame (fuse position) or fused breaker.