Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation
Guide That Contains This Content
[+] Expand All
[-] Collapse All

    Packing the C Series Controller for Shipment

    To pack the chassis for shipment:

    1. Ground yourself by using an antistatic wrist strap or other device.
    2. Retrieve the shipping box and packing materials in which the controller was originally shipped. If you do not have these materials, contact your Juniper Networks representative about approved packaging materials.
    3. On the console or other management device connected to the controller, enter CLI operational mode and issue the request system halt command to halt your system.
      user@host> request system halt

      Wait until a message appears on the console confirming that the operating system has halted.

      For more information about the command, see the SRC PE CLI Command Reference.

    4. Shut down power to the controller by holding down the power input switch.
    5. Disconnect power from the controller.
    6. Remove the cables that connect to all external devices.
    7. Remove all field-replaceable units (FRUs) from the controller.
    8. Remove the controller from the rack. One person should grasp the controller while a second person unscrews and removes the mounting screws from the rack. One lifter can then move the controller to the shipping container.
    9. Place the controller in the shipping container.
    10. Cover the controller with an ESD bag, and place the packing foam on top of and around the controller.
    11. Replace the accessory box on top of the packing foam.
    12. Securely tape the box closed.
    13. Write the RMA number on the exterior of the box to ensure proper tracking.

    Published: 2014-06-12