Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 

Overview of Verifying the State of a Routing Matrix

 

Purpose

To verify that you have successfully completed the integration procedure, verify that the state of the control planes, switching planes, and interfaces is correct.

Action

Note

Before you can issue the verification commands, you must be running the Junos OS Release 9.6R2 and later.

  1. Verify the state of the routing matrix control plane.

    See Verifying the State of the Routing Matrix Control Plane.

  2. Verify that the FPCs on the LCCs are detected and online.

    See Verifying That the FPCs on the Line-Card Chassis Are Detected and Online.

  3. Verify the state of the routing matrix switching planes.

    See Verifying the State of the Switching Planes in the Routing Matrix.

  4. Verify the state of the links in the routing matrix.

    See Verifying the State of the Links in the Routing Matrix.

  5. Verify the state of the interfaces on all the LCCs in the routing matrix.

    See Verifying the State of the Interfaces on a Line-Card Chassis.