Site Preparation Checklist for the SRX5800 Services Gateway

 

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for services gateway installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information ...

Performed By

Date

Verify that environmental factors such as temperature and humidity do not exceed services gateway tolerances.

SRX5800 Services Gateway Environmental Specifications

  

Plan rack or cabinet location, including required space clearances.

Clearance Requirements for SRX5800 Services Gateway Airflow and Hardware Maintenance

  

Select the type of rack or cabinet.

SRX5800 Services Gateway Cabinet Size and Clearance Requirements,

SRX5800 Services Gateway Rack Size and Strength Requirements

  

If a rack is used, secure rack to floor and building structure.

Connection to Building Structure for the SRX5800 Services Gateway Rack

  

Acquire cables and connectors.

   

Locate sites for connection of system grounding.

DC Power Electrical Safety Guidelines and Warnings

  

Measure distance between external power sources and services gateway installation site.

   

Calculate the optical power budget and optical power margin.

Calculating Power Budget for Fiber-Optic Cable for the SRX5800 Services Gateway,Calculating Power Margin for Fiber-Optic Cable for the SRX5800 Services Gateway