Site Preparation Checklist for the SRX3600 Services Gateway

 

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for services gateway installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information ...

Performed By

Date

Verify that environmental factors such as temperature and humidity do not exceed services gateway tolerances.

SRX3600 Services Gateway Environmental Specifications

  

Select the type of cabinet or rack.

SRX3600 Services Gateway Cabinet Size and Clearance Requirements and SRX3600 Services Gateway Rack Size and Strength Requirements

  

Plan rack or cabinet location, including required space clearances.

SRX3600 Services Gateway Cabinet Airflow Requirements

  

If a rack is used, secure rack to floor and building structure.

Connecting the SRX3600 Services Gateway to the Building Structure

  

Acquire cables and connectors.

   

Locate sites for connection of system grounding.

Grounding the SRX3600 Services Gateway

  

Measure distance between external power sources and services gateway installation site.

   

Calculate the optical power budget and optical power margin.

Calculating the Power Budget for Fiber-Optic Cable for the SRX3600 Services Gateway and Calculating the Power Margin for Fiber-Optic Cable for the SRX3600 Services Gateway